DIFFUL WBS 500w DC Solar Powered Pool Pump for Swimming Pool Variable-Speed Factory Price
- Model
- DLP15-14-48-500
Item specifics
- Material
- Plastic / ABS
- Package type
- Wooden case
- Application
- Swimming pool, Water park, Irrigation
- Pump Warranty
- 2 years
Review
- W***S
- 2021/5/26 03:55
Really happy with this pump. I paired it with two 370watt panels and it runs all day long. This works excellent for my 15,000 gallon pool.
Description








