DIFFUL WBS 2” DC Solar Bore Pump Submersible Well 48V 400W 64m head Clean Water Off Grid
DIFFUL WBS 2” DC Solar Bore Pump Submersible Well 48V 400W 64m head Clean Water Off Grid
DIFFUL WBS 2” DC Solar Bore Pump Submersible Well 48V 400W 64m head Clean Water Off Grid
DIFFUL WBS 2” DC Solar Bore Pump Submersible Well 48V 400W 64m head Clean Water Off Grid
DIFFUL WBS 2” DC Solar Bore Pump Submersible Well 48V 400W 64m head Clean Water Off Grid
DIFFUL WBS 2” DC Solar Bore Pump Submersible Well 48V 400W 64m head Clean Water Off Grid
Model
2DPC1.7-64-48-400

Item specifics

Brand
DIFFUL、WBS
Model
2DPC1.7-64-48-400
Included
DC solar pump with mppt controller
main material
Stainless Steel 304
Application
Irrigation, Poultry Farming, Ranch, Fountain,Bore
Pump Warranty
2 years
Controller
DC Auto-switching Controller
VOC
<120v
Package type
Wooden Case, Carton Packaging
FOB port
Ningbo, Shanghai

Review

Description

KeyWords