DIFFUL WBS Solar Well Pump kit,4inch 300V 2200W solar pump with mppt controller.
- Price
- US $969
- Model
- 4DFSW9.5-136-200-2200-A/D
- MOQ
- 1 piece
Item specifics
- Brand
- DIFFUL、WBS
- Model
- 4DFSW9.5-136-200-2200-AD
- Included
- AD solar pump with mppt controller
- main material
- Stainless Steel 304
- Application
- Irrigation, Poultry Farming, Ranch, Fountain,Bore
- Pump Warranty
- 2 years
- Controller
- AD Auto-switching Controller
- Motor
- Permanent magnet brushless motor
- VOC
- <450v
- Package type
- Wooden Case, Carton Packaging
- FOB port
- Ningbo, Shanghai
Review
Description












