DIFFUL WBS 3" DC Well Solar Water Pump Submersible Bore 150V 1500W 125m 6000L/H Irrigation
DIFFUL WBS 3" DC Well Solar Water Pump Submersible Bore 150V 1500W 125m 6000L/H Irrigation
DIFFUL WBS 3" DC Well Solar Water Pump Submersible Bore 150V 1500W 125m 6000L/H Irrigation
DIFFUL WBS 3" DC Well Solar Water Pump Submersible Bore 150V 1500W 125m 6000L/H Irrigation
DIFFUL WBS 3" DC Well Solar Water Pump Submersible Bore 150V 1500W 125m 6000L/H Irrigation
DIFFUL WBS 3" DC Well Solar Water Pump Submersible Bore 150V 1500W 125m 6000L/H Irrigation
Model
3DPC6-125-150-1500-AD

Item specifics

Brand
DIFFUL、WBS
Model
3DPC6-125-150-1500-AD
Included
AD solar pump with mppt controller
main material
Stainless Steel 304
Application
Irrigation, Poultry Farming, Ranch, Fountain,Bore
Pump Warranty
2 years
Controller
AD Auto-switching Controller
Motor
Permanent magnet brushless motor
VOC
<450v
Package type
Wooden Case, Carton Packaging
FOB port
Ningbo, Shanghai

Review

Description