WBS 4inch 2HP Hybrid AC/DC Solar Submersible Bore Pump SS304 Water-Filled Motor 4DFSW18-137-300-3000-AD
- Model
- 4DFSW18-137-300-3000-AD
Item specifics
- Brand
- DIFFUL、WBS
- Model
- 4DFSW18-137-300-3000-AD
- Included
- AC solar pump with mppt controller
- main material
- Stainless Steel 304
- Application
- Irrigation, Poultry Farming, Ranch, Fountain,Bore
- Pump Warranty
- 2 years
- Controller
- AC Auto-switching Controller
- Motor
- Permanent magnet brushless motor
- VOC
- <450v
- Package type
- Wooden Case, Carton Packaging
- FOB port
- Ningbo, Shanghai
Review
Description







