DIFFUL WBS Low Level Sensor for Solar Bore Well Pump Float Switch Tank Pool Water 20m Cable
DIFFUL WBS Low Level Sensor for Solar Bore Well Pump Float Switch Tank Pool Water 20m Cable
DIFFUL WBS Low Level Sensor for Solar Bore Well Pump Float Switch Tank Pool Water 20m Cable
DIFFUL WBS Low Level Sensor for Solar Bore Well Pump Float Switch Tank Pool Water 20m Cable
Price
US $59
Model
Well-sensor-20m
MOQ
1 piece

Item specifics

Brand
DIFFUL、 WBS
Model
Timer
main material
ABS

Review

Description

Description

This low level sensor is perfectly fit for DIFFUL WBS solar bore pumps.

Cable Length: 20m

Package Size: 27*17*6 cm

Connection Guide for WBS Solar Pump: Connect "WEL" and "COM" spot with DIFFUL WBS controller.