DIFFUL WBS 550W 48V Solar Direct DC Pressure Pump Farm Transfer OffGrid Irrigation
- Model
- DCPM26-15-72-1100
Item specifics
- Brand
- DIFFUL、WBS
- Model
- DCPM26-15-72-1100
- Included
- DC solar pump with mppt controller
- main material
- Stainless Steel 304
- Application
- Irrigation, Poultry Farming, Ranch, Fountain,Bore
- Pump Warranty
- 2 years
- Controller
- DC Auto-switching Controller
- Motor
- Permanent magnet brushless motor
- VOC
- <170V
- Package type
- Wooden Case, Carton Packaging
- FOB port
- Ningbo, Shanghai
Review
Description









