DIFFUL WBS DC Solar Water Pressure Jet Pump High Pressure 48V well pump kit Controller
DIFFUL WBS DC Solar Water Pressure Jet Pump High Pressure 48V  well pump kit Controller
DIFFUL WBS DC Solar Water Pressure Jet Pump High Pressure 48V  well pump kit Controller
DIFFUL WBS DC Solar Water Pressure Jet Pump High Pressure 48V  well pump kit Controller
DIFFUL WBS DC Solar Water Pressure Jet Pump High Pressure 48V  well pump kit Controller
DIFFUL WBS DC Solar Water Pressure Jet Pump High Pressure 48V  well pump kit Controller
Model
DJET2.7-45-48-550

Item specifics

Brand
DIFFUL WBS
Model
DJET2.7-45-48-550
Included
DC solar pump with mppt controller
main material
Cast Iron Casing
Pump Warranty
2 years
Controller
DC Auto-switching Controller
Motor
Permanent Magnet Brushless Motor
VOC
<120 V
Package type
Wooden Case, Carton Packaging
Application
Irrigation, Poultry Farming, Ranch, Fountain,Bore
FOB port
Ningbo, Shanghai

Review

Description